
Melvelle × Track Tec
Turnouts & crossings
Track Tec turnouts and special trackwork for mainline, metro and light rail. Built in Poland and Germany, supplied in Australia by Melvelle.
Supplied by Melvelle
Turnouts from Track Tec
Track Tec Group makes turnouts, sleepers and fastening systems in six plants across Poland and Germany, with roots going back to 1836. Its trackwork plant in Zawadzkie designs, machines and assembles turnouts in-house.
Melvelle brings the range to Australian networks. We work through the specification with you and coordinate engineering, delivery and support with Track Tec.


3,000
Turnouts a year
Built across Track Tec's plants in Poland and Germany.
45+
Countries
More than half of Track Tec's sales are exports.
32 m
Switch points
Double-head CNC lines mill two switch points at once, up to 32 m long.
250 km/h
High speed
High-speed turnouts in service on the Polish national network.
The range
What Track Tec builds
Vignole rail turnouts
Flat-bottom turnouts for mainline, high-speed, heavy-haul and industrial track.
Grooved rail turnouts
Embedded tram and light rail turnouts, crossings and curved track.
Crossovers & crossings
Single and double crossovers, diamond crossings and double slips.
Expansion devices
Rail expansion joints for bridges, viaducts and long-welded track.
Components & spares
Switches, frogs, forged tongue rails, guard rails and transition rails.
Pre-assembled on bearers
Delivered on concrete, timber or composite bearers, ready to lay.
How they're built
Machined, forged, assembled
- CNC machining of switch points and solid frog blocks
- 3,000-tonne press forges tongue rails to standard profile
- Head-hardened rails and frogs for longer wear life
- Flash-butt welding, with no filler metal

Laid out before it ships
Turnouts are pre-assembled and checked in the hall.

Checked at every stage
EN ISO 9001 quality assurance, testing and inspection.

Ready to install
Shipped pre-assembled, with full technical documentation.

Track Tec references
Proven on metro and light rail
Vancouver
SkyTrain
500+ turnouts, crossovers and expansion devices since 2013
Edmonton
Valley Line LRT
120+ turnouts and crossovers, 2016–2025
Ottawa
O-Train Confederation Line
110+ turnouts and crossovers, stages 1 and 2
Zürich
VBZ trams
Tram turnouts, crossings and embedded track, 2024–2026
Gothenburg
Tramways
50+ tram turnouts and crossings since 2020
Poland
PKP national network
Every third turnout installed, including 250 km/h
Start a quote
What we need to quote a turnout
Don't have it all yet? Send what you have. A drawing or tender specification is a good start.
- 01Gauge
- 02Rail profile and grade
- 03Turnout radius and rail inclination
- 04Maximum axle load
- 05Frog type and grade
- 06Sleepers or bearers, and who supplies them
- 07Fastening system, and who supplies it
- 08Locking device and point machine (manual or electric)
- 09Single or double crossover
- 10Grooved rail: encapsulation or hollow sleepers
Turnouts on your next project?
Talk to our Newcastle team about Track Tec turnouts, crossings and spares.

